Follow us on

Current location:

Home > ChinaCompliance
Call for Comment: Six Energy Efficiency Standards Updated for Appliances and Industrial Equipment – JUL 2026

2026.08.14 17:49

Author:admin

Tags: by ED02 #Energy Efficiency

Share to--:

On July 22, 2026, the Secretariat of the National Technical Committee 20 on Energy Fundamentals and Management (SAC/TC20) released for public comment six mandatory energy efficiency standards that will reshape performance requirements for a wide array of products, ranging from household gas water heaters and televisions to industrial welding machines, fans, and electric motors. The draft revisions are open for comment until September 18, 2026.

The following table summarizes the key technical revisions and proposed implementation timelines for each of the six standards:

Standard Code and   Name

Main Technical   Changes

Proposed Transition   Period

20251054-Q-469   Minimum allowable values of energy efficiency and energy efficiency grades   for domestic gas instantaneous water heater and gas fired heating and hot   water combi-boilers

Refines   definitions; deletes “energy-saving evaluation value” and corresponding   requirements; splits efficiency grades into three   independent tiers for hot-water, heating, and NOx emissions; adds annual   energy consumption and CO2 calculation methods; removes inspection rules.

24   months after publication

20261401-Q-469   Minimum allowable values of energy efficiency and energy efficiency grades   for copy machines, printers and scanner

Expands   scope to include scanners; introduces recovery time and sleep mode preset   delay time as new technical metrics with corresponding definitions; deletes   energy-saving evaluation value definition and associated indicators; adjusts   energy efficiency grade requirements; removes inspection rules; newly adds a   dedicated calculation method for recovery time.

24   months after publication

20261404-Q-469   Minimum allowable values of energy efficiency and energy efficiency grades   for welding machines

Broadens   scope to include handheld laser welders; adds energy efficiency grades and   definitions for this category; adjusts existing energy efficiency grade   provisions for arc welding machines and resistance welding machines; adds   specific requirements for handheld laser welder efficiency grades; modifies   test methods.

12   months after publication

20262558-Q-469   Minimum allowable values of energy efficiency and energy efficiency grades   for flat panel televisions and set-top boxes

Expands   scope; adds definitions for “quick start standby mode” and “quick-start   standby power”; adjusts energy efficiency grade requirements for both   televisions and set-top boxes; modifies energy efficiency limit values and   adds quick start standby power limits; updates overall energy efficiency test   methodology; modifies test signal and procedure requirements for televisions;   modifies standby power measurement method for televisions; modifies power   test conditions for set-top boxes.

12   months after publication

20262559-Q-469   Minimum allowable values of energy efficiency and energy efficiency grades   for fan

Revises   scope and references; deletes definitions for “minimum allowable values of   energy efficiency for fan” and “plant”; replaces the previous type-specific   grading with a single overall efficiency grade (including drive systems)   uniformly applied across all fan types.

12   months after publication

20262560-Q-469   Minimum allowable values of energy efficiency and values of efficiency grade   for motors

Revises   scope; adds normative references; modifies the standardized requirements to   be met for efficiency tolerance; adds nominal efficiency limit values for   low-voltage variable-frequency three-phase asynchronous motors across all   efficiency grades; introduces efficiency test methods for variable-frequency   motors.

12   months after publication

For foreign stakeholders, the mandatory upgrade of these standards will require a reassessment of product compliance for relevant exports to the Chinese market. Transition periods vary from 12 to 24 months depending on the product category, and the public consultation period remains open until September 18, 2026, allowing time for interested parties to review the draft texts and evaluate potential impacts.


Related News